Zijin’s technical experts are now gearing up to take the Akyem Gold Mine to the next level—ushering in a transformative phase that could reshape the mine’s future and deepen its impact on Ghana’s gold industry.
The plan is ambitious: by integrating world-class exploration technologies and rethinking the mine’s cut-off grade through the lens of economic geology, Zijin is unlocking new possibilities buried beneath the surface. This strategic approach is expected to significantly increase Akyem’s resource base, turning what was once marginal ore into valuable reserves.
What does this mean for Akyem? More gold. More years of operation. And greater returns for all stakeholders—from local workers and suppliers to the national economy. It’s a high-potential shift from extraction to optimization, from output to longevity.
Already operating a high-throughput carbon-in-leach (CIL) facility with a design capacity of 8.5 million tonnes per year, Akyem is no stranger to performance. But now, performance meets vision. With new data-driven exploration and international best practices guiding the way, Zijin is positioning Akyem not just as a mine, but as a model for what 21st-century mining in Africa can look like.
In the world of gold, few assets combine stability and growth like Akyem. And as Zijin sets its sights on expansion, Akyem is more than ready to lead Ghana’s mining future—smarter, stronger, and more sustainable than ever.
