Residents and motorists in Budo City in the Tarkwa-Nsuaem Municipality are expected to benefit from reduced travel times and improved access to healthcare following the completion of a road project funded by the Gold Fields Ghana Foundation.
The 2.26-kilometre Budo City to Bogoso Junction Road is expected to reduce journeys that previously took between 30 minutes and one hour during heavy traffic to approximately 10 minutes.
General Manager of Gold Fields’ Tarkwa Mine, Dr Catherine Kuupolo Kuutor, said the project was undertaken in response to concerns raised by residents and motorists about the poor condition of the road and the difficulties it created for commuters.
Speaking at the formal handover of the road on Wednesday, she said a survey conducted by the Gold Fields Ghana Foundation, involving 142 residents and 104 motorists, found that more than 92 per cent of respondents rated the road as being in poor or very poor condition.
The concerns included potholes, poor drainage, flooding, road width and dust.

According to Dr Kuutor, 97 per cent of motorists surveyed said the road condition added between 30 minutes and one hour to their journeys, while nearly six in 10 residents reported that commercial drivers refused to enter the community.
A similar proportion also experienced delays or difficulties accessing healthcare.
She said the poor condition of the road had placed additional pressure on the Atuabo Junction to Bogoso route, which carried the traffic that would otherwise have used the Budo City road.
The completed project includes road surfacing with a prime coat and double bituminous surface dressing, with concrete paving in some sections.
To address the drainage challenges, the Foundation constructed approximately 4,250 metres of concrete U-drains and 255 metres of additional drainage infrastructure.
The project also included the installation of 59 road signs and nine speed humps to improve safety for motorists and other road users.
Dr Kuutor said the project, initially scheduled for completion within two years, was delivered in one year and six months without compromising quality.
She disclosed that 33 people from the surrounding communities secured employment during the construction phase, including artisans, mechanics, machine operators and labourers. Local suppliers also benefited from business generated by the project.
The road was constructed by local contractor Woodbine Ventures under technical supervision by the relevant authorities.
Dr Kuutor said the new route was expected to encourage commercial drivers to return to Budo City, reduce vehicle maintenance costs and improve residents’ access to schools, markets and healthcare facilities, particularly during emergencies.
She called on the Urban Roads Department and the Tarkwa-Nsuaem Municipal Assembly to establish a regular maintenance programme to ensure the road’s long-term sustainability.
She also urged residents to organize regular clean-up exercises to desilt the drains and prevent flooding during heavy rainfall.
The Budo City road project forms part of the Gold Fields Ghana Foundation’s broader infrastructure investments in its host communities.
Dr Kuutor said the Foundation had invested more than US$76.8 million in infrastructure projects, including small-town water supply systems, the Tarkwa-Nsuaem Stadium, the Tarkwa-Damang Road and the rehabilitation of internal roads.
